1 - Objective:
Definition, evaluation and risk assessment in an organized and well thought out
and productivity within the organization must do so in an orderly fashion to
determine the risks and identify necessary actions and develop plans for their
implementation
2 - Scope of application
:
This procedure applies to all public activities of the Foundation and detailed
in their internal and external
3 - Definitions:
Under this item is defined meanings of symbols and terms used in
explaining the procedure and lists the items in the form of branching of item 3
Example:
3-1 - the evaluation process: risk assessment
3-2 - Safety Officer: Chief Executive Officer is responsible for safety in the
organization (varies according to the unnamed institution / Safety Manager /
Safety Monitor / Safety Engineer / Head of Department or safety management /
supervisor safety / safety officer / safety coordinator, etc. ..)
3-3 - the means of prevention: Personal protection equipment
4 - Responsibilities:
4-1 Safety Officer:
responsible for determining the various
activities of the Foundation.§
responsible for the implementation of
the risk assessment process§
responsible for supplementing the data
in the reports and proposed measures to control risks§
responsible for following up and
updating the system (every three years)§
4-2 Director / Manager - Branches
cooperation in the implementation of the
risk assessment process.§
assist in clarifying urgent preventive
measures§
4-3 the rest of the Staff
help wherever required in the
implementation of the risk assessment process§
5 - roads (means):
5-1 - a full enterprise-level activities must be defined and tested and, if
necessary, is that retail activities and customized for each site of the work
sites.
5-2 - if required, can be divided into the main activities to the activities of
partial to more focus and precision in the risk assessment process.
5-3 - fill in the model is the definition of risk for each activity of the
institution's activities internal and external (including the business office
and buffet), and this form contains the following information: -
a clear description of the activity§
for completion of the work (activity)
(number of minutes or hours) and repetitive activity (daily, every two or three
days, weekly, monthly, etc. .....)§
the number of people who were doing this
work (partial and total number)§
workplace / environment, which leads
through the activity and assess their suitability for the job.§
devices, equipment, machinery,
installations and other sources used in the performance of work and how they
are maintained.§
procedures and guidance and work
instructions available for staff to do the work§
type of training received by staff /
implementers work§
the organization of supervision of the
work place.§
personal protective equipment available
to workers.§
Any additional risks been discovered during the evaluation process and sites
that need to make a separate evaluation. See
the form (01)
5-4 - is filled with risk assessment model for each rate risk is defined in
this model
Depending on the risk is clear and its presence in the workplace (depending on
the activity of the institution) and the model includes the following: -
high-risk groups who have been
identified (employees, visitors, public)§
potential danger§
duration of exposure to risk (and is
equal to how long the work is done by)§
recurrence risk (injuries and material
damage)§
rate risk (the risk of each is defined
in the form))§
the degree of risk control§
Additional procedures targeted to
control the risks associated with high rates.§
Rate risk is measured by finding the result of multiplying the previous values for
each risk to be determined. According
to that test is the adequacy of current safety measures to control this risk,
whether protection measures, methods of work, information ... Etc.)
Also be determined whether there was a need to investigate later.
See the form (.........)
5-5 - Safety Officer (Director, engineer, supervisor of safety according to the
name of the company) brings together all the models described the activity of
the sections of the various work and a list of risks that adopted in the identified
classification rate risk is the work schedule the outcome of risk that has been
created through a process of assessment (risk with
high rates and not enough with the safety procedures in place)
5-6 - According to the importance of actions are identified for each risk has
been identified and this action is later transferred to the safety plan and are
following up and making sure applied by the Safety Officer
6 - records (restrictions):
6-1 - Description of activity model - a model (,,,,,,,,,)
6-2 risk analysis model - a model (.........)
One of the ways workers and people can identify hazards at different workplaces is by providing them safety training online programs as those courses can help people be more educated about hazards and risks at different working environment.
ReplyDeleteHazards is identify the industries and construction safety take safety training !!
ReplyDeletesafety training institute in Chennai
nebosh course in Chennai
Nebosh in Chennai
Nebosh safety courses in Chennai
This comment has been removed by the author.
ReplyDeletecsp-asp course cochin
ReplyDeletenvq diploma in cochin
lead auditor course in cochin
safety course in hyderabad
nebosh igc course in hyderabad